What we doLand originationGrid and powerPermitting and planningConnectivitySite enablementHandover and RTBSupercharging sites
Portfolio
Sustainability
AboutThe companyOriginsThe namePhilosophyGovernanceCareers
Insights
Contact

Energy infrastructure development

The ground for
what comes next.

Envik develops sites for data centers and for high-power charging across the Nordic countries, bringing land, power and permits together into a project ready for construction.

1.6GW
Pipeline, contracted or applied for
150MW
At ready-to-build stage
2029
Earliest portfolio energization

What Envik develops

Two verticals.
One method.

Envik is a Nordic energy infrastructure developer, working in two verticals for Europe’s leading operators: data center sites and supercharging sites.

Each data center position is bought and carried on Envik’s own balance sheet, ahead of any buyer, and runs to the point where an operator can begin construction. The charging work came first: Envik ran charging sites as an operator before it developed them for others, so it has been the customer of the process it now runs.

The portfolio

Where power meets demand.

Capacity in the north, where the grid still has room to give it, and positions in the south, where the demand is and every connection is contested. The site below is ready to build.

Available now - SE2

Ready to build.
Room to grow.

Envik SE2-01 · Västernorrland

Grid capacity
150 MW
Site area
24 ha
Earliest energization
2029

Consents in force and dated grid capacity. Project documentation is available to qualified counterparties under NDA.

Request the site package

Pipeline capacity includes contracted capacity and applications. Development targets are distinct from secured power and remain subject to each project’s approvals and connection program.

A connection is more than a point on a map.

Capacity, conditions and timing have to be understood together. The grid workstream begins at the first site assessment.

Wind turbines on a snowy Nordic hillside at dawn

Long-term responsibility

The site is part of a bigger place.

Energy, water, nature and the surrounding community shape a project from the outset.

Envik considers power supply, heat recovery, cooling and land use during development, while the choices that influence long-term impact are still open.

A site for your
next project.

Share your capacity, location and timing, and Envik comes back with the positions that fit.

A future for
your land.

Find out what your land could carry: an initial look at grid access, planning and ground, at no cost.